Skip to main content

Folder 7c

 Container

Contains 1 Collection or Record:

Pool deck cable - E4 Series, May 18, 1994

 File — Folder: 7c, Folder: 22
Description From the Collection: The Olympic Aquatic Center drawings were produced between May 18, 1994 and November 27, 1995, from the combined partnerships of Stanley, Love-Stanley, P.C. and Smallwood, Reynolds, Stewart, Stewart. These drawings entail specifics for both assembly and disassembly of the Aquatic arena that was used for the 1996 Summer Olympic Games. Included in the collection are overall plans, detailed section drawings, elevations, and schedules for the electrical, plumbing, and materials of this building....
Dates: May 18, 1994