Skip to main content

Construction - financial incremental costs for temporary projects, 1996

 File — Box: 44, Folder: 2

Scope and Contents

From the Series:

This series comprises the planning materials of the GT facilities department and physical work done to campus and offsite locations. Subjects include construction, village security, landscaping, information and technology logistics, and parking and transportation for the Olympic Village and Olympic operations. (Parking and transportation materials for staff, faculty, and students are listed in Series I: GT Institute Operations).

Dates

  • Other: 1996

Creator

Restrictions: Access

This collection is open for research. Portions of the collection are restricted.

Full Extent

From the Collection: 27.27 Linear Feet (62 document cases, 1 oversized box, 3 oversized flat files, 1 5.25” floppy disk, 1 VHS tape, 4 pencils)

Language of Materials

English

Repository Details

Part of the Archives and Special Collections, Library, Georgia Institute of Technology Repository

Contact:
Library
Georgia Institute of Technology
266 4th Street, NW
Atlanta 30332-0900 USA
404-894-4586